1.The structure of the incident report is covered in the standard for software test Documentation IEEE829 and is called as?
a, Defect report
b, Anomaly Report
c, Test defect report
d, Test incident report

2.Which of the following is a type of non-Functional testing?
a, Dataflow Testing
b,Usability Testing
c, Statement Coverage
d, Cause-effect graphing

3. The cost of fixing a fault?
a.Can never be determined
b, Increases as we move the product towards live use
c,Decreases as we move the product towards live use
d, Is more expensive if found in requirements than functional design

4. The tool that supports traceability, recording of incident or scheduling of test is called?
a, A debugging tool
b, A test execution tool
c, A dynamic analysis tool
d, A Configuration management tool

5. Which of the following is not phase of the functional testing process?
a,Test Planning and control
b,Test implementation and execution
c, Requirement analysis
d, Evaluating Exit criteria and reporting

6. Bug life cycle?
a, Assigned, open, fixed, closed
b.open, fixed, assigned, closed
c, Assigned, open, closed, fixed
d, open, assigned, fixed, closed

7. Peer reviews are also called as ?
a, Inspection
b, Walkthrough
c, Formal review
d, Technical review

8. Benefits of Independent testing?
a, Independent testing cannot identity defects
b, Independent testers can test better than developers
c, Independent testers are much more qualified than developers
d, Independent testers see other and different defects and are unbiased.

9. Which of the following is not a black box testing technique?
a, LCSAJ
b, Syntax testing
c, State transition testing
d, Equivalence partitioning

10. Which of the following is not part of performance testing?
a, Recovery testing
b, Measuring response time
c, Measuring transaction rates
d, Generating many transactions

11. Beta testing is ?
a, Performed by an independent test team
b, Performed by customers at their own site
c,Performed as early as possible in the lifecycle
d. Performed by customer at their software developer’s site

12. Software quality is not relevant to ?
A, Viability
B, Usability
C, reusability
D, Correctness

13. Error guessing is best used?
a. Only by end user
b, After the system has gone live
c, As the first approach to deriving test case
d, After more formal techniques have been applied

14. The provision and management of a controlled library containing all the configurations items is called as ?
A, status accounting
B, Configuration control
C, Configuration identification
D, None of the above

15, When do you stop testing?
A, When all statements have been executed
B, When the test completion criteria are met
C, When the specified number of fault are found
D, When all high and medium priority test are complete

16. IEEE 829 test plan documentation standard contains all of the following except?
a. Test items
b, test deliverables
c, Test Specification
d, test environment

17. Which of the following is not a type of incremental testing approach?
A, Big bang
B, top down
C, bottom up
D, none of the above

18. Which of the following is not part of configuration management?
A, Controlled library access
B, Identification of test versions
C, Auditing conformance to      ISO9001
D, Record of changes to documentation over time

19. Test conditions are derived from?
A, Test data
B, Test cases
C, Test design
D, Specification

20. The kick off phase of a formal review includes the following?
A, follow up
B, Explaining the objective
C, Individual meeting preparation
D, fixing defects found typically done the author